Akoma

0113

Website proposal · July 2026

Launch the Timber Institute.

A public platform for pallet timber research, innovation and built applications.

Prepared by Akoma for Muneer
Qurtuba Precinct, Johannesburg

Scroll to begin

The opportunity

This is bigger than a building archive.

It is the foundation of an institute.

Offices, a restaurant, a musallah, a design studio and glamping units already demonstrate different applications of reclaimed pallet timber.

Qurtuba is the founding address. The Timber Institute is the public proposition.

Timber building at Qurtuba Precinct

The material story

Pallets became parts.
Parts became place.

Discarded pallets were deconstructed into stringers and blocks.

Those components became stacked walls, infill, cladding and detailed block arrangements.

The foundation

The Institute begins with evidence.

01

Built prototypes

Six named buildings test pallet timber across different uses and scales.

02

Photography

A deep library of professional project images, ready to be curated.

03

Book and renders

Written material by Arifa, photographs by Azraa and architectural renders by Zackiye.

04

Academic context

Yusuf Patel is a professional architect and PhD researcher at Newcastle University.

The proposition

One institute. A clear specialism.

01

Lead with pallet timber innovation.

Position the Timber Institute around the exploration, testing and creative application of reclaimed pallet timber.

02

Prove the proposition through built work.

Use Qurtuba's buildings as the first prototype library, showing how pallets have been applied across real projects.

The website

Structured like an innovation platform.

The built work supports the story. It does not define the whole site.

01

Home

The Institute's purpose, specialism and invitation to explore.

02

The Institute

03

Why pallet timber

04

Prototype library

05

Applications

06

Research and collaboration

The content

From source material to a working knowledge platform.

Akoma will use the existing archive to explain the material system, organise the prototypes and make the Institute's purpose clear.

01Explain pallet components and applications

02Organise six buildings as prototype studies

03Integrate existing photographs, renders and plans

04Frame premium, community and affordable contexts as areas for exploration

A glamping unit at Qurtuba Resort among mature trees

The programme

Live before the summit.

Target launch: 4 September. Contract deadline: 8 September 2026.

  1. 27 Jul-7 Aug

    Align and design

    Technical meeting, site structure, copy direction and key-page design.

    Gate 1
  2. 10-21 Aug

    Build and integrate

    Development, prototype content and existing media integration.

    Gate 2
  3. 24-28 Aug

    Review and test

    Staging review, consolidated feedback and quality assurance.

    Gate 3
  4. 31 Aug-4 Sep

    Launch

    Final revisions, domain connection, handover and release.

    Gate 4

The investment

R50,000

Fixed ceiling · Excluding VAT · No additional production budget

On appointmentR25,000

Deposit to begin the work.

On launchR25,000

Final payment after sign-off.

Included in Phase 1

Everything needed for the Institute's first public release.

Institute-led responsive website

Six prototype studies

Pallet timber system and applications pages

Website visual identity

Content curation and web copy

Basic search setup and image alt text

Content management system

Hosting and domain setup on your accounts

Research and collaboration section

Two design revision rounds

One final minor revision round

Saleh technical alignment meeting

Account ownership, walkthrough and handover pack

Clear boundaries

What sits outside this fee.

New photography, video or other content production

New architectural drawings or renders

Book design or production

A full identity package beyond the website

Ongoing updates after launch

E-commerce, booking or payments

Extra pages or multilingual content

What we need from you

One clear route to decisions.

01Pre-appointment technical meeting with Saleh

02One point of contact

03Complete existing source material at kick-off

04Consolidated feedback within two business days at each gate

05Written sign-off before launch

The 8 September deadline depends on prompt access, decisions and consolidated feedback.

What the platform can enable

Launch the Institute now. Build its programme from evidence.

The website creates the public foundation. These programmes remain outside the R50,000 website scope.

01

Academic partnerships

02

Corporate social investment and grants

03

Housing-focused pilot projects

04

Events, workshops and expanded content

Architectural render of Fig and Olive at Qurtuba

The next step

Let's launch the Timber Institute.

Confirm the go-ahead and we will meet Saleh, lock the scope and begin work towards the 4 September target launch.

Zubair
On behalf of Akoma

R50,000 excl. VAT