Built prototypes
Six named buildings test pallet timber across different uses and scales.
0113
Website proposal · July 2026
A public platform for pallet timber research, innovation and built applications.
Prepared by Akoma for Muneer
Qurtuba Precinct, Johannesburg
Scroll to begin ↓
The opportunity
It is the foundation of an institute.
Offices, a restaurant, a musallah, a design studio and glamping units already demonstrate different applications of reclaimed pallet timber.
Qurtuba is the founding address. The Timber Institute is the public proposition.
The material story
Discarded pallets were deconstructed into stringers and blocks.
Those components became stacked walls, infill, cladding and detailed block arrangements.
The foundation
Six named buildings test pallet timber across different uses and scales.
A deep library of professional project images, ready to be curated.
Written material by Arifa, photographs by Azraa and architectural renders by Zackiye.
Yusuf Patel is a professional architect and PhD researcher at Newcastle University.
The proposition
Position the Timber Institute around the exploration, testing and creative application of reclaimed pallet timber.
Use Qurtuba's buildings as the first prototype library, showing how pallets have been applied across real projects.
The website
The built work supports the story. It does not define the whole site.
The Institute's purpose, specialism and invitation to explore.
The content
Akoma will use the existing archive to explain the material system, organise the prototypes and make the Institute's purpose clear.
01Explain pallet components and applications
02Organise six buildings as prototype studies
03Integrate existing photographs, renders and plans
04Frame premium, community and affordable contexts as areas for exploration
The programme
Target launch: 4 September. Contract deadline: 8 September 2026.
Technical meeting, site structure, copy direction and key-page design.
Gate 1Development, prototype content and existing media integration.
Gate 2Staging review, consolidated feedback and quality assurance.
Gate 3Final revisions, domain connection, handover and release.
Gate 4The investment
Fixed ceiling · Excluding VAT · No additional production budget
Deposit to begin the work.
Final payment after sign-off.
Included in Phase 1
Institute-led responsive website
Six prototype studies
Pallet timber system and applications pages
Website visual identity
Content curation and web copy
Basic search setup and image alt text
Content management system
Hosting and domain setup on your accounts
Research and collaboration section
Two design revision rounds
One final minor revision round
Saleh technical alignment meeting
Account ownership, walkthrough and handover pack
Clear boundaries
New photography, video or other content production
New architectural drawings or renders
Book design or production
A full identity package beyond the website
Ongoing updates after launch
E-commerce, booking or payments
Extra pages or multilingual content
What we need from you
01Pre-appointment technical meeting with Saleh
02One point of contact
03Complete existing source material at kick-off
04Consolidated feedback within two business days at each gate
05Written sign-off before launch
The 8 September deadline depends on prompt access, decisions and consolidated feedback.What the platform can enable
The website creates the public foundation. These programmes remain outside the R50,000 website scope.

The next step
Confirm the go-ahead and we will meet Saleh, lock the scope and begin work towards the 4 September target launch.
Zubair
On behalf of Akoma
R50,000 excl. VAT